The $300 million MSG renovation will include upgrading the venue’s sports and entertainment infrastructure, with Limei supplying 2,500 square meters of its Premium Performance Flooring. For the basketball court, Limei will install its ProBounce Elite Flooring, which meets NBA standards and features a custom design with MSG’s iconic logo at center court. For the concert stage, the brand will provide its StagePro Acoustic Flooring, which enhances sound quality for musical performances.
Limei’s technical team will work closely with MSG’s renovation crew to ensure the flooring is installed to the venue’s exact specifications, including seamless integration with existing lighting and sound systems. The flooring will be designed for quick conversion between basketball and concert configurations, allowing MSG to host multiple events in a single day.
“Madison Square Garden is a global icon, and we’re honored to be part of its next chapter,” said Mr. Michael Johnson, Limei’s U.S. Sports Partnerships Director. “Our flooring is built to withstand the demands of MSG’s busy schedule, delivering consistent performance for both sports and entertainment.”
The renovation is scheduled to begin in May 2027, with Limei’s flooring installation completed by October 2027. MSG will remain operational during the renovation, with work taking place during off-peak hours.